CANDU cousins in India – Performance in 2015

By: Donald Jones, P.Eng., retired nuclear industry engineer, 2016 March 28

Most of India’s nuclear reactors are of the pressurized heavy water reactor (PHWR) type with horizontal pressure tubes, just like the Canadian designed CANDU. In fact the first PHWR (not the first nuclear reactor) in India was the Rajasthan Atomic Power Project (RAPP) unit and was a CANDU designed by Atomic Energy of Canada Limited (AECL) that used the Douglas Point unit in Ontario as reference design but modified to aid localization. RAPP-1 entered commercial operation 1973 December. While RAPP-1 was being constructed the design of RAPP-2 was started (Author’s note: I know because I was part of design team). However the detonation of a nuclear device by India in 1974 curtailed completion of the design by AECL and India was on its own as far as nuclear technology was concerned. The design was completed by India and RAPP-2 eventually entered commercial operation in 1981 April. Since those early days India has developed its own indigenous designs of PHWRs with net electrical outputs of 202 MW, 490 MW, and 630 MW. They bear little to no resemblance to Douglas Point. All 17 PHWR units operating in 2015 (excludes RAPP-1 which has been shutdown since 2004) were 202 MW (220 MW gross) except for two 490 MW (540 MW gross) units. There were four 630 MW (700 MW gross) units under construction with none in operation. All PHWR power units, except for RAPP-1, are designed, owned, and operated by Nuclear Power Corporation of India Ltd. Several of the country’s PHWRs have been refurbished for extended life operation. For more detailed information on the Indian nuclear program see, Nuclear Power in India (reference 1).

The performance data are taken from the Power Reactor Information System (PRIS) database of the International Atomic Energy Agency (IAEA). Note that the Load Factor term used in the PRIS database has the same meaning as Capacity Factor (CF). CFs are based on the (net) Reference Unit Power and on the (net) Electricity Supplied, as defined in the PRIS database, so capacities referenced in this article are net electrical MW output. The lifetime, or cumulative, CF is based on the date of commercial operation and will include the outage time if the unit has been refurbished. Only the performance of India’s PHWRs is reviewed in detail but India’s three operating non-PHWR units are mentioned.

Lifetime CFs and some recent annual CFs have suffered because of uranium shortages and India’s technical isolation because of it not being a signatory to the Nuclear Non-Proliferation Treaty. Things eased somewhat with the Nuclear Suppliers’ Group agreement achieved in 2008 but the civil liability law introduced in 2010 has still restricted access to foreign technology. Some units are not under International Atomic Energy Agency (IAEA) safeguards and cannot use imported uranium and domestic uranium is in short supply. All this has affected and may still be affecting plant performance. Even so at the end of 2013 Rajasthan unit 5 held the world record in lifetime CF at 94.4 percent, according to Nuclear Engineering International magazine (PRIS data give 94.9 percent to end of 2013). On 2014 September 6 Rajasthan unit 5 achieved a 765 day continuous run at full power. This shows what good design and good operation/maintenance can accomplish (references 2 and 3). Maybe India is thinking what Winston Churchill said, in a wartime 1941 speech, aimed at the U.S.A.,”Give us the tools, and we will finish the job”.

Kaiga
Kaiga-1 entered commercial operation in 2000 November. Annual CF for 2015 was 98.4 percent with a lifetime CF of 71.2 percent.
Kaiga-2 entered commercial operation in 2000 March. Annual CF for 2015 was 90 percent with a lifetime CF of 70.3 percent.
Kaiga-3 entered commercial operation in 2007 May. Annual CF for 2015 was 103 percent with a lifetime CF of 63.2 percent.
Kaiga-4 entered commercial operation in 2011 January. Annual CF for 2015 was 93.9 percent with a lifetime CF of 76.3 percent

The average annual CF for the four units for 2015 was 96.3 percent and lifetime CF was 70.2 percent. All four units are 202 MW.

Kakrapar
Kakrapar-1 entered commercial operation in 1993 May. Annual CF for 2015 was 87.1 percent with a lifetime CF of 64.6 percent.
Kakrapar-2 entered commercial operation in 1995 September. Annual CF for 2015 was 44.1 percent with a lifetime CF of 72.6 percent.

Kakrapar units 1 and 2 are 202 MW. Unit 1 had a major refurbishment 2009-2010 and has a CF since refurbishing of about 93 percent based on (net) Electricity Supplied and Reference Unit Power given in PRIS database. Despite having a low annual CF for 2015 the average annual CF for unit 2 over the last five years is 79.8 percent.
UPDATE: Unit 1 suffered a small LOCA (loss of coolant accident) on 2016 March 11 when there was a rupture in a fuel channel assembly. India’s Atomic Energy Regulatory Board said that, as of March 15, there had been no radioactivity releases exceeding the daily limits for normal operation and the unit is in a safe cold shutdown state while the investigation takes place.

Madras
Madras-1 entered commercial operation in 1984 January. Annual CF for 2015 was 90.8 percent with a lifetime CF of 52.7 percent.
Madras-2 entered commercial operation in 1986 March. Annual CF for 2015 was 69.8 percent with a lifetime CF of 55.6 percent.

Both units are 205 MW and both were refurbished 2002-2005 for life extension when their capacity was restored back to 205 MW from 155 MW. For the last five years the average annual CFs for units 1 and 2 have been 71.8 percent and 59.4 percent respectively.

Narora
Narora-1 entered commercial operation in 1991 January. Annual CF for 2015 was 88.6 percent with a lifetime CF of 54.4 percent.
Narora-2 entered commercial operation in 1992 July. Annual CF for 2015 was 81.9 percent with a lifetime CF of 57.7 percent.

Both units are 202 MW. Unit 2 was refurbished 2009-2010. For the last five years unit 2 had an average annual CF of 63.8 percent.

Rajasthan
Rajasthan-1 entered commercial operation in 1973 December. Annual CF for 2015 was zero percent with a lifetime CF of 18.7 percent.
Rajasthan-2 entered commercial operation in 1981 April. Annual CF for 2015 was 79.7 percent with a lifetime CF of 55.8 percent.
Rajasthan-3 entered commercial operation in 2000 June. Annual CF for 2015 was 89.6 percent with a lifetime CF of 76.5 percent.
Rajasthan-4 entered commercial operation in 2000 December. Annual CF for 2015 was 83.9 percent with a lifetime CF of 77.8 percent.
Rajasthan-5 entered commercial operation in 2010 February. Annual CF for 2015 was 96.3 percent with a lifetime CF of 93.5 percent.
Rajasthan-6 entered commercial operation in 2010 March. Annual CF for 2015 was 75.4 percent with a lifetime CF of 77.3 percent.

The average annual CF for units 2 to 6 (excludes RAPP-1) was 85 percent with an average lifetime CF of 76.2 percent. Rajasthan unit 1 (RAPP-1) is 90 MW and unit 2 is 187 MW. Units 3 to 6 are 202 MW. RAPP-1 was shutdown in 2004 and the Department of Atomic Energy, as owner, is considering its future. RAPP-2 was derated in 1990 to 187 MW and has been refurbished. It has been running at an average annual CF of 82.6 percent over the last five years. On 2014 September 6 Rajasthan unit 5 completed 765 days of continuous operation at full power. This is the world’s second longest continuous run. Only Pickering unit 7, a CANDU in Ontario, has exceeded this with a world record run of 894 days in 1994. Units at other Indian stations have also had some long periods of continuous operation. At the end of 2013 unit 5 also held the world record for lifetime CF at 94.4 percent, according to Nuclear Engineering International magazine.

Tarapur
Tarapur-3 entered commercial operation in 2006 August. Annual CF for 2015 was 94.3 percent with a lifetime CF of 73.6 percent.
Tarapur-4 entered commercial operation in 2005 September. Annual CF for 2015 was 87.6 percent with a lifetime CF of 63.5 percent.

Tarapur 3 and 4 are 490 MW units.

Nuclear units other than PHWRs on India’s grid

Kudankulam
Kudankulam-1 began commercial operation 2014 December 31 so 2015 was its first year of operation. It is a Russian PWR (pressurized water reactor) with a reference electrical unit power (net) of 917 MW (from PRIS) and gross electrical power of 1,000 MW.
Annual CF for 2015 was 40 percent with a lifetime CF of 40 percent.

Tarapur
Tarapur-1 began commercial operation in 1969 October 28. It is a United States General Electric BWR (boiling water reactor) and was India’s first nuclear reactor with a reference electrical unit power (net) of 150 MW (from PRIS) and gross electrical power of 160 MW.
Annual CF for 2015 was 32.5 percent with a lifetime CF of 62.5 percent.
Tarapur-2 also began commercial operation 1969 October 28. Unit 2 has same power rating as unit 1.
Annual CF for 2015 was 56.4 percent with a lifetime CF of 63.7 percent.

Average CF of all PHWRs
The average annual CF of all 17 operating PHWRs (excludes RAPP-1) was 85.5 percent with an average lifetime CF of 68 percent. The relatively high annual CF and low lifetime CF is indicative that the industry is recovering from past shortages of uranium fuel. In 2014 the average annual CF for the same 17 PHWRs was 79.4 percent with an average lifetime CF of 66.6 percent (reference 4).
References

1. Nuclear Power in India, World Nuclear Association, http://www.world-nuclear.org/information-library/country-profiles/countries-g-n/india.aspx

2. Performance of Ontario’s CANDU nuclear generating stations in 2015, Don Jones, 2016 March 19, https://thedonjonesarticles.wordpress.com/2016/03/18/performance-of-ontarios-candu-nuclear-generating-stations-in-2015/

3. CANDU 6 performance in 2015, Don Jones, 2016 March 27, https://thedonjonesarticles.wordpress.com/2016/03/28/candu-6-performance-in-2015/

4. CANDU cousins in India – Performance in 2014, Don Jones, 2015 March 29, https://thedonjonesarticles.wordpress.com/2015/03/29/candu-cousins-in-india-performance-in-2014/